S K Singh as I know

Work is worship- it is always said. When I see him this phrase always comes in my mind. He is industrius, intelligent, calm during emegent situation and able to tackle difficult position/situation. His fUll profile is given below: SHEO KISHORE SINGH IN PURSUIT OF EXCELLENCE Ref :Linked in: http://www.linkedin.com/pub/s-k-singh/8/a68/b43 shivashila.wordpress.com Mobile 09435332422 Present Job Description : Strategic Planning for scheduling & execution of related with projects & plant maintenance Resource Planning & Allocation. Vendors & Contractors Development & Appraisal. Planning for Continuous Plant improvement Attending review meetings & resolution of interdepartmental and intradepartmental conflicts. Monitoring of cost involved. Attend progress review meetings with company’s Directors Identifying personnel training needs & ensuring training. Plant Shut Down Planning Reduction in maintenance cost without compromising plant reliability. Feedback of site problems for incorporating solutions in future designs. To ensure Statutory Compliances. To ensure ISO Compliances. To ensure issue of NITs, collection of offer, scrutiny of documents and supply of material & inspection and execution of jobs within the time frames for spares & and retrofit jobs. Evaluation & approval of estimations. Ensure implementation of improvement in design and proposals. Provide support to production department for better plant operation. Co-ordination and Interaction and liasioning with International Consultants. Day to day monitoring of plant performance & taking preventive measures. Present Assignment • Working as G M ( Operation & Maintenance) at BVFCL Namrup & Factory Manager Looking after - Mechanical Instrumentation Electrical Civil Material Management Project & Planning Fire & Safety • Reporting to: Director/C M D • Area of work: Complete Plant but not limited to *Jack well & water treatment Plant *D M Plant *Captive Power Plant *Ammonia Plant *Central Mech workshop including NDT Section. Auto shop, Heavy Earth Moving Section.etc. *Monitoring & trouble shooting of all the rotary machines in complete plant *Urea Plant *Product Handling *Spare parts planning *Planning Cell *Project *Study of energy consumption & taking necessary step for reduction. *Study & implementation of work (Jobs) after checking technical suitability for increasing plant capacity & reliability * Any task as assigned Major achievements: Increase in Urea Production. Modification of Reformed Gas Boiler in consultation with M\s L & T & its installation for sustained operation. Complete replacement of Syn Gas Compressor complete train along with turbine in a record period of 60 days. Education B.Sc. Engg. (Mech) in the year 1979 Four Year Degree Course in Mechanical from M.I.T.Muzaffarpur, Bihar Personal Details Date of Birth: 17th Jan 1957 Address: 40/V/E BVFCL Township, Namrup, PO- Parbatpur Distt- Dibrugarh, Assam PIN- 786623 Professional Snapshot  Over 30 years of experience in planning, erection operational/maintenance engineering & project management entailing production planning, process optimization, trouble shooting, commissioning and maintenance etc of steam generation Plant, Captive Power Plant & Urea and Ammonia Plant (Fertiliser) plant  Proficient in managing the entire operations including startup erection/commission, quality, costing etc keeping in compliance with time and budgetary parameters.  Deft in handling Operation ensuring maximum equipment avability (rotating equipments)  Proven success in successfully Commissioning of Ammonia Plant, Captive Power Plant, Revamp Project of Ammonia plant based on N.G feed stock.  Vast knowledge of Operation of Reformers, Centrifugal pumps, Centrifugal Compressors, Steam Turbines, Frame-5 Gas Turbines, Coal Fired Boilers, Gas Fired Boilers, Conveyor system etc.  An effective leader with strong communication, trouble shooting and planning skills.  Team build up for maintenance for maintenance/operation activities.  Proven success as head of Operation & Maintenance of Ammonia Plant III. The plant was stabilised for sustained operation after a gap of many years during my tenure as Area Manager of the plant.  After revamping got involved in A-II Plant, the plant was stabilised for sustained production. Organisational Details-Career Path July’2012 – till date BVFCL, Namrup GM (U)8 March’2009 – July’2012 BVFCL, Namrup Dy G M7 (Maint) April’2006 - March’ 2009 BVFCL, Namrup Chief Engineer (M)6 March’2001–April’2006 BVFCL, Namrup Additional Chief Engineer5 /Area Manager (Amm-III) Jul’1997- March’2001 HFCL, Namrup Dy.Chief Engineer (M)4 Mar’1994- Jul’1997 HFCL, Namrup Plant Engineer (M)3 Nov’1985-Mar’1994 HFCL, Namrup Asstt. Plant Engineer (M)2 June’81- Nov’85 HFCL, Barauni Junior Engineer (M)1 Joined as Management Trainee in June’1980 at HFCL Durgapur. 1As Junior Engineer (M)  Maintenance 0f 3 nos. of coal fired Boiler – Pulveriser, coal mill (hammer type), PF lines, Pumps, turbines, fans etc.  Repairing of ID Fan rotor- replacement of vanes, In situ dynamic balancing  Repairing of Turbine rotor, replacement of vanes with new ones & get it dynamically balanced.  Complete maintenance of 1000 Te/day Urea Plant – Heat exchangers, Pumps, compressors, Turbines, Gear Boxes, Governing system etc.  Trouble shooting & maintenance of Coal fired boilers, Gas fired boilers & its accessories, coal handling, ash handling etc 2As Asstt. Plant Engineer (M) Project Management (Between Nov’85 – Aug’87) for N-III Project Amm Plant (brown field):  Overall planning, scheduling and management of projects, ensuring completion of assignments within time and budgetary parameters.  Actively involved in planning for materials, developing vendors to obtain timely procurement of materials and equipments to facilitate smooth production process.  Responsible for preparing engineering designs / drawings, proposals / quotations and carrying out techno commercial functions.  Monitoring projects with respect to Cost, Resource Deployment, Time over-runs, Quality Compliance and Manpower planning to ensure timely execution of projects. Installation/Commission  Preparing layouts for the project as per the process  Foreseeing performance bottlenecks and taking corrective measures to avoid the same.  Site preparations, mobilization of contractors for carrying out erection activities.  Erection, commissioning, Complete overhauling of Centrifugal & reciprocating compressors, steam turbines, centrifugal & reciprocating pumps , Blower & Fans, Gas turbine etc.  Erection, commissioning of equipments, providing utility services to the equipments Gas fired boilers, Gas Turbine etc.  Commissioning of rotary equipments (Pumps, Compressors & Turbines) of the plant Maintenance • After successfully commissioning of Amm-III plant worked as in charge of site maintenance activities in Mechanical after Aug’87. • Successfully maintenance of Amm-III Plant by proper trouble shooting for sustained operation of the plant after revamp • Performing the functions of troubleshooting and predictive / breakdown / preventive including Annual Turn-around maintenance for reducing machinery downtime to minimum. • Trouble shooting/ maintenance & to make rotating machineries (turbines & compressors) reliable for continuous operation • Undertaking cost reduction & process improvement initiatives for enhancing overall plant efficiency & reducing down time. • Handling repair or replacement faulty mechanical equipment, testing of new mechanical systems & equipments and rectification of defect, Condition monitoring & Vibration analysis of rotary equipments. • Spare parts planning, ATA preparation. • Application of National/ International codes and ability to check Design of Heat Exchangers/ Pressure Vessels with an analytical aptitude, process oriented thinking and strong execution capabilities. • Preparation of Inquiry specification, review and recommendation of design and drawing documents. Contract Management  Coordinating procurement activities like tendering & bid management, estimations, techno-commercial evaluations, contract negotiations etc.  Preparation of technical specifications & scope and deliverables, estimates and BOQ based on requirements generated during detailed engineering of the project.  Preparation of vendor list for supply of misc Items. Development & Co-ordination with vendors Planning • N D T of rotary equipments, pipe lines & pressure vessels • Vibration monitoring & failure analysis, in-situ dynamic balancing • Predictive maintenance of critical equipments • Maintenance planning based on predictive maintenance. • Shut down planning • Material procurement • Reduction of energy consumption & improvement of plant performance As Plant Engineer3 & Deputy Chief Engineer4  Complete In charge of Mechanical maintenance (Functional Head) of Namrup III Ammonia Plant  Coordination with different departments viz. Production, Elect, Inst & Civil  Preparation of plant modification to remove bottle necking, Rectification of chronic problems.  Liasioning with OEMs, Vendors  Complete review of N D T, Pdm, procurement activities, technical specifications & scope, vendor list, spare part planning etc. As Additional Chief Engineer5 /Area Manager (Amm-III) As area Manager (upto Nov’2005)  Worked as complete in charge of Ammonia III Plant comprising Production, Mechanical, Electrical & Instrumentation.  Complete study of plant for identification of week areas.  Preparation of complete scheme along with scope of work for revamping & negotiation with expert agency (PDIL)  Finalisation of schemes as per approved budget.  Review of NITs, Quotations (Technical) & follow up for material after placement of Purchase Order.  I/C of revamping acties of A-III plant. Major areas:  Reformation – Primary & Secondary Reformer  R G Boiler  Installation of DCS System  Major overhauling of compressor & drive turbines with modification of -3 turbine of M/s BHEL supporting system. As Additional Chief Engineer (M)  Complete In charge of Mechanical Maintenance for Ammonia Group of plant & boiler/CPP.  Involvement in ongoing revamp jobs of Amm-II Plant of Namrup II.  Study of problems in coordination of operation in each of machineries & taking necessary action with available resources without the help of OEMs for reduction of time.  Establishing the Amm-II plant for sustainable operation. Major Achievment: Operation of Amm-III Plant on sustainable after a gap of 10 Yrs. Started taking measures for reduction of energy. As Chief Engineer (M)6 Chief Engineer Planning cell (Feb’2007-Mar’2008) Setting up of planning cell for structured maintenance activities consisting the following:  Development of structured process to plan work  Modification and/or expansion of plan  Scheduling of work  Auditing of schedule  Introduction of root cause study based on cause-effect analysis (5 why)  In house repairing of major components  Preparation of indents of critical items,  Procurement of services and ascertaining the reliability of the source. Chief Engineer N-III (Mar’2008-Mar’2009) Worked as Head of Mechanical & instrumentation maintenance for N-III group of plant comprising Ammonia, Urea, Bagging & CPP. In charge of all the activities required for the purpose of maintenance. As Dy General Manger7 Worked as I/c of Maintenance activities (elect, mech, inst, civil etc ) Major area of work:  Planning and Strategising  Initiates, Implements and manages the plant maintenance program based on best practices in the industry, with an emphasis on planning/ scheduling and preventive maintenance  To monitor the shift and general shift activities of technicians and engineers.  Monitors the use and inventories of spare parts, maintenance supplies, and equipment and initiates reordering when necessary  Day to day man and material planning.  PDM planning and scheduling  Break down analysis and corrective action  To plan for yearly expenditure and monitor the cost time to time  Revamping of machine or equipment, Vendor developments  Policy and Process Design, Implementation and Review  Implements programs and procedures required to ensure plant cleanliness  Assists with planning and implementing plant improvements and expansions.  Identify / secure critical supply and service agreements  To monitor the PM, B/d history record time to time  ISO documents to be maintained time to time  Coordination, Interface, Imparting Training  Tracks, analyzes and improves key maintenance parameters such as asset utilization, maintenance cost, PM compliance, etc.  Communicates regularly with all maintenance technicians both individually as well as a group concerning maintenance issues.  Need based training to staff internal or external  Management of performance, capability and morale  Conducts employee performance reviews based on job descriptions to determine competency, knowledge and contribution of maintenance technicians.  Infrastructure and Technology Investment and Management MAJOR ACHIEVMENT Conversion of S100 Ammonia Convertor into S200 in a record time of 18 days. Construction of BNANDH and channel in the local Dilli River (Dishang) to ensure availability of water round the year REFERENCES 1 Sri R K Aggarawal Director Kribhco 2. Sri A K Dixit Ex Sr G M IFFCO – SHYAM

Sunday, October 31, 2010

Corruption

- India’s corruption watchdog, Central Vigilance Commission, pointed out irregularities in more than a dozen projects and questioned the quality of the venues. Huge piles of rubble and rubbish, a collapsed roof, hanging wires, leaky walls, broken tiles and an incomplete stadium have become the visual staple of daily newspapers and television channels.
- Scandal after scandal has been unraveled revealing kickbacks, shadowy off-shore firms, forged emails, inexplicable payments to bogus companies and inflated bills — for every purchase from toilet paper to treadmills.
-- Present Maharashtra Chief Minister Sri Ashok Chavan on 30th Sept offered to resign over allotment of flats in Mumbai meant for war heroes to unauthorised people.

Are the things as described above come under the perview of corruption?. Then, first of all the question arises what is " Corruption " ? It may be defined as :
- impairment of integrity, virtue, or moral principle or depravity
- decay, decomposition of moral or social values
- inducement to wrong by improper or unlawful means (as bribery, force, to corece etc.)
- a departure from the original or from what is pure or correct
- anarchy (an agency or influence that corrupts)

Corruption is a phenomena by which all are affected in one form or another. Yet, it is also true that majority of us do not want to speak against it. All are afraid (expect a few) but no body wants to resist. There is tendency to blame others. Buck passing seems to be an easiest way. In fact no body wants or tries to evaluate himself.
Corruption has become a way of life in many countries. It is real but unfortunate that our country has also got entrapped by it. For small bribes bribe paid during railway booking, traffic police to multi-million Rupees kickbacks for officials who hold sway over the vast economy of the country.
The 2010 Corruption Perceptions Index by Transparency International has awarded the most clean slot to Denmark, New Zealand and Singapore with a score of 9.3, while Somalia has been declared the most corrupt country with a score of 1.1 on a scale from 10 (highly clean) to 0 (highly corrupt).
India stands at the 87th position by scoring 3.3,, while its neighbour Pakistan ended up with the 143th rank with a score of 2.3.China and Brazil, the other two major emerging economies, were ranked at 78th and 69th respectively by Transparency International.
Russia, meanwhile, slide down the global corruption league to joint 154th with Cambodia, Kenya and Laos. It was Russia's lowest ranking since the index began in 1995. Last year it was 146th.
The Index clearly shows that nearly three quarters of the 178 countries in the index score below five, indicating a serious corruption problem in many of the countries. It is also evident from the living standard,amount of development and prosperity of the people in that specific country. In India, we may also see the same phenomena in different states.
One cannot battle corruption with words and nice bits of paper.It can not bring success. It has to be won by involving all the persons otherwise the struggle with corruption will come to a dead end. Only a handful of people can not fight corruption. It is required to be fought on individual level as well as together at the level of Organisation and society. Corrupt persons are more powerful than others.

Wednesday, September 9, 2009

पागलपन

पागलपन क्या है ? पागल कौन है? क्या पागल वह व्यक्ति है दुनिया के बकवास को नहीं मानता? क्या समाज जिसे पागल करार दे, वह पागल है? कौन सा ऐसा व्यक्ति है जो गुस्से में पागल नहीं होता ? धन, सम्पति या शक्ति पाने के बाद किसे पागलपन का नशा नहीं छाता ?
"पागल" शब्द अपने आप में एक दुनिया समेटे हुए है. किसी को पागल कह देना एक आम बात है. कभी नीचा दिखाने के लिए, कभी सम्पति हड़पने के लिए या किसी अन्य कारणों से पागल के रूप में प्रचारित करना एक आम बात है.

Tuesday, July 28, 2009

What to write ?

It is very difficult to write for me. First the question arises what to write? There are so many things upon which we are able to write? In the jing-jang or jungles of titles one get perplexed.Mind starts wandering from one subject to another. It is never able to concentrate on one subject.
If we are able to pass the initial hurdle then the question arises how to write? There are so many poses, styles available for writing on a subject. Again the mind gets involved in the whirling. Starts searching the different material available here and there.

Wednesday, July 15, 2009

Hi

I am Anupama Aishwarya - a new enterant in the world of blogging. Welcome to all in my blog.